the consumer of HESCOM residing at ,hereinafter, referred to as the "Prosumer" is giving consent for the following, who is generating, consuming and injecting the energy.
a. The Prosumer intends to connect and operate the Distributed Solar Photo Voltaic (DSPV) system with HESCOM’s HT/LT Distribution system for sale of Solar Power to HESCOM, in terms of the “Karnataka Electricity Regulatory Commission (KERC) Order dated: 22.08.2026.
b. The Prosumer intends to install a DSPV system of kWp capacity on the existing roof top of the premises, situated at and bearing number RR. No in the same premises, under of HESCOM.
c. The Prosumer intends to sell the energy, generated from the DSPV system to HESCOM on net metering basis, from the date of commissioning of the DSPV system.
Explanation: the ‘Commissioning’ means the stage at which the DSPV system starts generating the power for the use by the Prosumer and injects surplus power if any, into the grid.
d. HESCOM intends to purchase the energy, generated by such DSPV system, on Net-metering basis, at the tariff determined by the KERC.
Now therefore, in consideration of the foregoing premises, the parties, hereto, intending to be legally bound, hereby agree as under:
e. The HESCOM shall pay for the net energy at Rs per kWh,as determined by the KERC order dated: 25.08.2026 for term of this agreement
f. The Prosumer shall commission the project as per KERC / HESCOM Standard Operating Procedure(SOP). If for any reason the date of commissioning is delayed, beyond the date of commissioning agreed. The tariff payable by the HESCOM shall be lower of the.
g. The Prosumer, shall pay the Electricity tax and other statutory levies, pertaining to DSPV generation, as may be levied from time to time.
h. The Prosumer shall not have any claim for compensation, if the Solar power generated by his DSPV system could not be absorbed by the distribution system due to failure of power supply in the grid/distribution system for the reasons, such as line clear, load shedding and line faults, whatsoever.
i. This Consent given shall be in force for a period of 25 years from the date of commissioning of the DSPV system as detailed in the HESCOM Standard Operating Procedure (SOP).
j. All the disputes between the parties arising out of or in connection with this Consent given shall be first tried to be settled through mutual negotiation. The parties shall resolve the dispute in good faith and in equitable manner. In case of failure to resolve the dispute, either of the parties may approach the appropriate law Forum.
I undertake to abide by the provisions of:
I affirm that the information provided above is true and correct to the best of my knowledge and belief, and I have read and understood the terms and conditions governing the installation and operation of the DSPV system under the gross Meter Scheme.
I hereby agree and abide for the above consentthe consumer of HESCOM residing at ,hereinafter, referred to as the "Prosumer" who is generating, consuming and injecting the energy is giving consent for the following terms and conditions.
a. a. The Prosumer intends to connect and operate the Distributed Solar Photo Voltaic (DSPV) system with HESCOM’s HT/LT Distribution system for sale of Solar Power to HESCOM, in terms of the “Karnataka Electricity Regulatory Commission (KERC) Order dated: 25-08-2026.
b. The Prosumer intends to install a DSPV system of kWp capacity on the existing roof top of the premises, situated at and bearing number RR. No in the same premises, under of HESCOM.
c. The Prosumer intends to sell the energy, generated from the DSPV system to HESCOM on net metering basis, from the date of commissioning of the DSPV system.
Explanation: the ‘Commissioning’ means the stage at which the DSPV system starts generating the power for the use by the Prosumer and injects surplus power if any, into the grid.
d. HESCOM intends to purchase the energy, generated by such DSPV system, on Net-metering basis, at the tariff determined by the KERC.
Now therefore, in consideration of the foregoing premises, the parties, hereto, intending to be legally bound, hereby agree as under:
e. The HESCOM shall pay for the net energy at tariff determined by the KERC order dated:25-08-2026 for term of this consent
f.The Prosumer shall commission the DSPV plant within 180 days from the date of this consent.
g.If for any reason the date of commissioning is delayed, beyond the date of commissioning agreed, the tariff payable by the HESCOM shall be lower of the.
h. The Prosumer, shall pay the Electricity tax and other statutory levies, pertaining to DSPV generation, as may be levied from time to time.
i. The Prosumer shall not have any claim for compensation, if the Solar power generated by his DSPV system could not be absorbed by the distribution system due to failure of power supply in the grid/distribution system for the reasons, such as line clear, load shedding and line faults, whatsoever.
j The prosumer shall arrange to shift the existing meter to the generation side of DSPV plant to measure solar power generation and install Bidirectional meter (whole current/CT operated) at the point of interconnection to the distribution system, at a suitable place in the premises accessible for recording export of energy from the DSPV system to the grid and import of energy to the premises of the consumer from the grid
k In case the exported energy is more than the imported energy HESCOM shall pay for the net energy exported, as per the Tariff agreed in this application, within 30 days from the date of issue of bill, duly adjusting the fixed charges and electricity duty, if any.
l In case, the exported energy is less than the imported energy, the Seller shall pay HESCOM for the Net energy imported as per the prevailing retail supply tariff, determined by the Commission from time to time
m The HESCOM shall pay interest at the same rates as is being levied on the consumers, for late payment charges, in case of any delay in payment beyond 30(thirty) days period from the date of issue of bill, for the Net energy exported
n. This Consent given shall be in force for a period of 25 years from the date of commissioning of the DSPV system as detailed in the HESCOM Standard Operating Procedure (SOP).
o. All the disputes between the parties arising out of or in connection with this Consent given shall be first tried to be settled through mutual negotiation. The parties shall resolve the dispute in good faith and in equitable manner. In case of failure to resolve the dispute, either of the parties may approach the appropriate law Forum.
I undertake to abide by the provisions of:
I affirm that I have read and understood the terms and conditions governing the installation and operation of the DSPV system under the Net Metering Scheme.
This consent has been given on Mon Nov 23 05:36:26 IST 2026
I hereby agree and abide for the above consentthe consumer of HESCOM residing at ,hereinafter, referred to as the "Prosumer" who is generating, consuming and injecting the energy is giving consent for the following terms and conditions.
a.The Prosumer intends to connect and operate the Distributed Solar Photo Voltaic (DSPV) system with HESCOM’s HT/LT Distribution system for sale of Solar Power to HESCOM, as per the clause 3.5 of the KERC Regulations 2026 and KERC Order dated: 25-08-2026.
b. The Prosumer intends to install a DSPV system of kWp capacity on the existing roof top of the premises, situated at and bearing number RR. No in the same premises, under of HESCOM.
c.The Prosumer intends to generate energy from the DSPV system for his own use on net metering basis from the date of commissioning of the DSPV system and for excess energy if any injected to the grid accounted at the end of the month shall be at no cost to HESCOM
d.HESCOM intends to purchase the energy, generated at no cost to HESCOM by such DSPV system, on Net-metering basis and only account the energy, at the tariff determined by the KERC.
Now therefore, in consideration of the foregoing premises, the parties, hereto, intending to be legally bound, hereby agree as under:
e.For the entire term of the agreement, HESCOM shall reckon the net energy if any at a notional tariff of Rs per kWh as determined by the KERC vide order dated:25.08.2026 solely for accounting and energy adjustment purposes. It is expressly agreed and acknowledged by the parties that such notional tariff shall not give rise to any financial liability claim or payment obligation whatsoever on HESCOM and no amount shall be due, payable or recoverable by the seller in respect of such net energy under the agreement.
f.The Prosumer shall commission the DSPV plant within 180 days from the date of this consent.
g.If for any reason the date of commissioning is delayed, beyond the date of commissioning agreed, the notional tariff for accounting purpose by the HESCOM shall be lower of the
h. The Prosumer, shall pay the Electricity tax and other statutory levies, pertaining to DSPV generation, as may be levied from time to time.
i. The Prosumer shall not have any claim for compensation, if the Solar power generated by his DSPV system could not be absorbed by the distribution system due to failure of power supply in the grid/distribution system for the reasons, such as line clear, load shedding and line faults, whatsoever.
j The prosumer shall arrange to shift the existing meter to the generation side of DSPV plant to measure solar power generation and install Bidirectional meter (whole current/CT operated) at the point of interconnection to the distribution system, at a suitable place in the premises accessible for recording export of energy from the DSPV system to the grid and import of energy to the premises of the consumer from the grid
k In case the exported energy is more than the imported energy HESCOM shall take into account the net energy at the tariff of Rs per kWh as determined by the KERC vide order dated:25.08.2026 solely for the purpose of energy accounting and it is expressly agreed that no payment whatsoever shall be due or payable by HESCOM in respect of such net energy.
The seller remit to HESCOM any other charges as may be applicable in accordance with the prevailing rules, regulations and orders issued by the Competent Authority from time to time
l In case, the exported energy is less than the imported energy, the Seller shall pay HESCOM for the Net energy imported as per the prevailing retail supply tariff, determined by the Commission from time to time
m. This Consent given shall be in force for a period of 25 years from the date of commissioning of the DSPV system as detailed in the HESCOM Standard Operating Procedure (SOP).
n. All the disputes between the parties arising out of or in connection with this Consent given shall be first tried to be settled through mutual negotiation. The parties shall resolve the dispute in good faith and in equitable manner. In case of failure to resolve the dispute, either of the parties may approach the appropriate law Forum.
I undertake to abide by the provisions of:
I affirm that I have read and understood the terms and conditions governing the installation and operation of the DSPV system under the Net Metering Scheme.
This consent has been given on Mon Nov 23 05:36:26 IST 2026
I hereby agree and abide for the above consent
| Applicant Name: | |
| Applicant Address: | |
| Subdivision code: | |
| Subdivision Name: | |
| RR Number: | |
| Sanctioned Load / Contract demand: | |
| Connection Type: | |
| Tariff category: |
@ 2022 - Design By hescom